CASE NUMBER: 15-0464-EL-BLN
CASE DESCRIPTION: Black River-Johnson No.2 138kV Transmission Line Re-conductor and Structure Replacement Project
DOCUMENT SIGNED ON: 4/25/2024
DATE OF SERVICE: ________________________________________
11/10/2016 Letter of Notification that the Black River-Johnson No.2 138 kV Transmission Line Reconductor and Structure Replacement Project that construction on this Project was completed on October 20, 2016 filed by Nataliya Bryksenkova on behalf of FirstEnergy Service Company.
09/26/2016 Letter of notification that construction on the Black River-Johnson No. 2 138 kV Transmission Line Reconducor and Structure Replacement Project commenced September 6, 2016 filed on behalf of FirstEnergy Service Company by N. Bryksenkova.
07/30/2015 Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB.
05/19/2015 Proof of Pub of Public Notice of Project in The Morning Journal electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/19/2015 Proof of Pub of Public Notice of Project in The Chronicle Telegraph electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/07/2015 In the matter of the Letter of Notification for the Black River-Johnson No.2 138kV Transmission Line Reconductor and Structure Replacement Project.