DIS - Case Record for 12-3157-EL-BLN Skip to main content
      
      
CASE NUMBER: 12-3157-EL-BLN
CASE DESCRIPTION: AVERY-GREENFIELD 138 KV TRANSMISSION LINE EXTENSION TO HAYES SUBSTATION
DOCUMENT SIGNED ON: 4/24/2024
DATE OF SERVICE: ________________________________________
07/25/2014 Correspondence that the Avery-Greenfield 138kV Transmission Line Extension to Hayes Substation was placed in service May 15, 2014 and construction completed approximately June 16, 2014 filed by S. Humphrys on behalf of FirstEnergy.
01/31/2013 Report of investigation electronically filed by Mr. Adam S Bargar on behalf of Staff of OPSB.
12/07/2012 In the matter of the application of the Letter of Notification for Avery-Greenfield 138 kV Transmission Line Extension to Hayes Substation