DIS - Case Record for 12-3157-EL-BLN Skip to main content

Case Record For:

12-3157-EL-BLN

File a Public Comment
Case Title: AVERY-GREENFIELD 138 KV TRANSMISSION LINE EXTENSION TO HAYES SUBSTATION
Status: OPEN-OPEN
Industry Code: EL-ELECTRIC
Purpose Code: BLN-letter of notification
Date Opened: 12/7/2012
Date Closed:
Printable Docket Card Service List
View per page
Date FiledSummaryPages
07/25/2014Correspondence that the Avery-Greenfield 138kV Transmission Line Extension to Hayes Substation was placed in service May 15, 2014 and construction completed approximately June 16, 2014 filed by S. Humphrys on behalf of FirstEnergy.1
01/31/2013Report of investigation electronically filed by Mr. Adam S Bargar on behalf of Staff of OPSB.3
12/07/2012In the matter of the application of the Letter of Notification for Avery-Greenfield 138 kV Transmission Line Extension to Hayes Substation 28