DIS - Case Record for 11-4884-EL-BTX Skip to main content
      
      
CASE NUMBER: 11-4884-EL-BTX
CASE DESCRIPTION: AMERICAN TRANSMISSION SYSTEMS INC
DOCUMENT SIGNED ON: 4/24/2024
DATE OF SERVICE: ________________________________________
01/11/2016 Memo closing cases with an effective date of 1/11/16.
12/24/2014 Letter of Notification that Minor construction activities, primarily maintaining erosion controls while vegetation becomes reestablished in areas disturbed by construction, are still underway and are expected to be completed in Spring 2015 filed by Jessica Thacker on behalf of FirstEnergy Service Company.
11/04/2014 Access Map Figure 1 Revision electronically filed by Ms. Jessica L Thacker on behalf of FirstEnergy Service Company.
07/26/2013 Letter of Notification of an engineering design change that is being submitted in Case No. 11-4884-EL-BTX, the East Springfield-London-Tangy 138 kV Transmission Line Project filed by Jessica Thacker on behalf of FirstEnergy Service Company.
03/11/2013 Service Notice
03/11/2013 Opinion, Order and Certificates stating that the Stipulations filed by the parties be approved and adopted and that certificates be issued to ATSI for the construction, operation, and maintenance of the Line Project, along the preferred route, and the Substation Project, at the preferred site.
02/19/2013 Public comment response letter mailed to Rep. A. Brenner from Chairman, T. Snitchler, OPSB Staff.
02/11/2013 Public comment in support of the Preferred Route for the ESLT Project filed by Rep. Andrew O. Brenner on behalf of Ohio House of Representatives.
01/25/2013 Response letter sent to: Mrs. Diana J. Lockwood filed by K. Wissman on behalf of OPSB.
01/24/2013 Response letter sent to Jim Bodenmiller filed by T. A. Snitchler, Chairman on behalf of OPSB.
01/24/2013 Public response sent to Mr. & Mrs. McLinn filed on behalf of the OPSB by M. Butler.
01/24/2013 Public response letter to Mr. Leslie M. & Susan W. Hall regarding the East Springfield-London-Tangy Transmission Project from OPSB Staff, K. Wissman.
01/23/2013 Exhibit "applicant's 4" from hearing held on January 23, 2013, filed by American Transmission Systems Incorporated.
01/23/2013 Transcript of American Transmission Systems, Inc. hearing held before Mr. Bryce McKenney and Ms. Greta See, Administrative Law Judges, at the Public Utilities Commission of Ohio, 180 East Broad Street, Room 11-C, Columbus, Ohio, called at 10 a.m. on Wednesday, January 23, 2013 electronically filed by Mrs. Jennifer Duffer on behalf of Armstrong & Okey, Inc. and Gibson, Karen Sue Mrs.
01/23/2013 Joint Exhibit 1-S Joint Stipulation of the Parties for London Substation Project electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
01/23/2013 Joint Exhibit 1-L, Joint Stipulation of the Parties for East Springfield London Tangy Transmission Line electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
01/17/2013 Correspondence in support of the 138kV electric power line on behalf of the City of Springfield filed by J.Bodenmiller.
01/17/2013 Statement in Lieu of Testimony on Behalf of Nationwide Realty Investors, Ltd. electronically filed by Mr. Christopher W. Michael on behalf of Nationwide Realty Investors, Ltd.
01/17/2013 Prefiled Testimony of Jim O'Dell on behalf of the Staff of the Ohio Power Siting Board submitted by Assistant Attorney General John H. Jones. electronically filed by Kimberly L Keeton on behalf of Ohio Power Siting Board
01/16/2013 Public response letter to Deborah A. Bauder regarding her concern with the East Springfield-London-Tangy Transmission Project from OPSB Staff, K. Wissman.
01/16/2013 Exhibits from hearing on January 7, 2013.
01/15/2013 Comments of The Nature Conservancy to The Public Utilities Commission of Ohio on the proposed ATSI/First Energy transmission line filed by A.Sasson, Freshwater Conservation Manager.
01/15/2013 Response letter sent to: Anthony Sasson filed by T. A. Snitchler, Chairman on behalf of OPSB.
01/14/2013 Comments regarding the proposed transmission line project filed by by A. Sasson on behalf of The Nature Conservancy.
01/14/2013 Testimony of Jay Ruberto on behalf of Applicant American Transmission Systems Incorporated electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.
01/14/2013 Notice of Mailing of Property Owner Letter and Notice to Local Government Officials electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
01/14/2013 Transcript of American Transmission Systems, Inc. hearing held before Mr. Bryce McKenney and Ms. Greta See, Administrative Law Judges, at the London City Council Chambers, 6 East Second Street, London, Ohio, on Tuesday, January 8, 2013, electronically filed by Mrs. Jennifer Duffer on behalf of Armstrong & Okey, Inc. and Gibson, Karen Sue Mrs.
01/14/2013 Transcript of American Transmission Systems, Inc. hearing held on 01/07/13, before Greta See and Bryce A. McKenney, Administrative Law Judges, at the Pleasant Valley Fire Department, 650 West Main Street, Plain City, Ohio, electronically filed by Mrs. Jennifer Duffer on behalf of Armstrong & Okey, Inc. and Sloas, Valerie J. Mrs.
01/14/2013 PUCO Exhibit filing from hearing on January 8, 2013.
01/10/2013 Public comment response letter mailed to Phillip Frey regarding the East Springfield-London-Tangy Transmission Project from K. Wissman, OPSB.
01/10/2013 Public comment response to William Parry filed by T. Snitchler on behalf of OPSB.
01/09/2013 Public comment regarding the East Springfield-London-Tangy Transmission Line Project filed by J. Laub.
01/09/2013 Public comment response sent to Jonas J. Gruenberg filed by K. Wissman on behalf of OPSB.
01/08/2013 Public comment filed by Jonas J. Gruenberg of Coolidge Wall objecting the proposed routing of the transmission lines in the London Substation Project.
01/07/2013 Service Notice
01/07/2013 Administrative Law Judge Entry considering motions to intervene, electronically filed by Vesta R. Miller on behalf of Greta See, Administrative Law Judge, Ohio Power Siting Board.
01/07/2013 Memorandum by ATSI Concerning Issues Potentially Requiring Cross-Examination at the Evidentuary Hearing electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.
01/04/2013 Notice List of Issues by Nationwide Realty Investors, Ltd. electronically filed by Mr. Christopher L. Miller on behalf of Nationwide Realty Investors, Ltd.
01/03/2013 Proof of Pub of Second Public Notice of Public and Evidenturary Hearings for the counties of: Delaware,Madison, Union, Montgomery, Clark, Warren, Butler, Clinton, Greene, Preble, Miami, Darke, Mercer, Shelby, Fayette, Logan, Hamilton, Clermont, Auglaize, and Champaign electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.
12/20/2012 Service Notice
12/20/2012 Petition for Leave to Intervene; memorandum in support and Request for Hearing on behalf of Nationwide Realty Investors, Ltd. electronically filed by Mr. Christopher L. Miller on behalf of Nationwide Realty Investors, Ltd.
12/20/2012 Staff Report Filed electronically filed by Mr. James S. O'Dell on behalf of Staff of OPSB.
12/20/2012 Motion to intervene and memorandum in support filed by J. Klein III on behalf of the City of Columbus, Ohio.
12/12/2012 Service Notice
12/12/2012 Administrative Law Judge Entry granting the motion to accept proof of publication of first public notice. - electronically filed by Sandra Coffey on behalf of Bryce McKenney, Attorney Examiner, Public Utilities Commission of Ohio.
12/04/2012 Motion to Accept Filing of Proof of Publication of First Public Notice of Public and Evidentiary Hearings and memorandum in support electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
11/05/2012 Service Notice
11/05/2012 Administrative Law Judge Entry granting the motion to consolidate, granting the motion for waivers, granting the motion for protective order, and setting the procedural schedule in this matter. - electronically filed by Sandra Coffey on behalf of Bryce McKenney, Attorney Examiner, Public Utilities Commission of Ohio.
09/21/2012 Letter Requesting Hearing Date electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.
09/18/2012 Public comment response to G. Carpenter regarding the East Springfield-London-Tangy Transmission Line Project from OPSB, T. Snitchler, Chairman.
09/17/2012 Correspondence supporting the preferred route filed by M. Coleman on behalf of the City of Columbus.
09/06/2012 Motion to consolidate proceedings and memorandum in support electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.
09/06/2012 OPSB public comments response letter sent to Kent and Rita Anders filed by PUCO Staff.
09/06/2012 Affidavit of proof of service electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
08/30/2012 OPSB Public Comments Response Letter sent to Mark A. Camp filed by OPSB Chairman.
08/27/2012 Response letter sent to Mr. Michael D. Tarullo filed by OPSB Staff.
08/27/2012 Response letter sent to Mr. Derek M. Garceau filed by OPSB Staff.
08/27/2012 Response letter sent to Ms. Margaret Ailshire filed by OPSB Staff.
08/27/2012 Response letter sent to Mr. George Leshy filed by OPSB Staff.
08/21/2012 Response letter sent to:Dr. Thomas J. Prestera filed by Klaus Lambeck, Chief on behalf of OPSB.
08/16/2012 OPSB Response Letter to B. Moffitt regarding the East Springfield -London-Tangy Transmission Line Project.
08/06/2012 Notice of Availability of Additional Copies of Information electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
07/30/2012 Response letter sent to: Bart Johnson filed by T.A. Snitchler, Chairman on behalf of OPSB.
07/30/2012 Response letter sent to: Ed and Terry Klinker filed by T.A. Snitchler, Chairman on behalf of OPSB.
07/30/2012 Letter of Notification electronically filed by Mrs. Tonnetta Y Scott on behalf of PUCO
07/20/2012 Response letter sent to: Mr Morgan Parke, Senior Corporate Counsel American Transmission Systems, Inc. filed by T.A. Snitchler, Chairman on behalf of OPSB.
07/19/2012 Response letter sent to: Gary Davis filed by T.A. Snitchler, Chairman on behalf of OPSB.
07/19/2012 Public Comment (total-1) by Gary Davis in support of preferred route.
07/18/2012 Response letter sent to: Robert W. Tucker filed by Todd A. Snitchler,Chairman on behalf of OPSB.
07/18/2012 Letter expressing support for the approval by the Ohio Power Siting Board for the Preferred Route for the ESLT Project filed by Tracy and Todd Feucht.
07/17/2012 Application Continued. (Volume 2, Revision 1, Part 2 of 2)
07/17/2012 Application Continued. (Volume 2, Revision 1, Part 1 of 2)
07/17/2012 Application continued. (Volume 1, Revision 1, Part 2 of 2)
07/17/2012 Application for a certificate of environmental compatibility and public need on behalf of American Transmission Systems, Incorporated filed by J. Toth. (Volume 1, Revision 1, Part 1 of 2)
07/17/2012 Response letter sent to: Tracy & Todd Feucht filed by Todd A. Snitchler, Chairman on behalf of OPSB.
07/17/2012 Letter expressing support for the approval by the Ohio Power Siting Board for the Preferred Route for the ESLT Project filed by Concerned Citizens.
07/17/2012 Letter expressing support for the approval by the Ohio Power Siting Board for the Preferred Route for the ESLT Project filed by R.W. Tucker.
07/17/2012 Amended Application Supplemental Environmental Data for Section 7 from Regulatory Agencies Concerning Threatened and Endangered Species electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
07/16/2012 Response letter sent to: Amy Helder filed by T.A. Snitchler, Chairman on behalf of OPSB.
07/16/2012 Response letter sent to: Ronald and Kathleen Moses filed by T.A. Snitchler, Chairman on behalf of OPSB.
07/16/2012 Response letter sent to: Tom and Cyndie Lasher filed by T.A. Snitchler, Chairman on behalf of OPSB.
07/13/2012 Public Comment in support of the Preferred Route for the ESLT Project filed by Tom & Cyndie Lasher.
07/12/2012 Public comment response sent to Michael A. Coughlin filed by OPSB Staff.
07/12/2012 Public comment response sent to Tad E. Goldmeyer filed by OPSB Staff.
07/12/2012 Public comment response sent to Lisa M. Fulton filed by OPSB Staff.
07/12/2012 Public comment response sent to Alan M. Fermier filed by OPSB Staff.
07/11/2012 Public comment in support to the Preferred Route for the ESLT Project filed by Ronald and Kathleen Moses.
07/11/2012 Public comment in support to the Preferred Route for the ESLT Project filed by A. Helder.
07/11/2012 Response letter sent to: Steve Hood filed by T.A. Snitchler, Chairman on behalf of OPSB.
07/10/2012 Public comment response sent to David W. Anderson filed by OPSB Staff.
07/10/2012 Public comment response sent to John D. Boyers filed by OPSB Staff.
07/10/2012 Public comment response sent to Robert Seely filed by OPSB Staff.
07/10/2012 Letter expressing support for the approval by the Ohio Power Siting Board for the Preferred Route for the ESLT Project filed by W.R.Ash, Jr.
07/10/2012 Public comment in support to the Preferred Route for the ESLT Project filed by A. Fernier.
07/09/2012 Response letter sent to William R. Ash, Jr. filed by OPSB Staff.
07/06/2012 Correspondence in support for the Preferred Route E. Springfield-London-Tangy (ESLT) 138 kV Transmission Line Project filed by Robert Seely.
07/06/2012 Correspondence in support for the approval by the Ohio Power Siting Board of Preferred Route for the ESLT Project filed by D. Anderson.
07/06/2012 Correspondence in support for the approval by the Ohio Power SIting Board of Preferred Route for the ESLT Project filed by J. Boyers.
06/28/2012 Response letter to Concord Township Board of Trustees regarding the Springfield-London-Tangy Project from K. Wissman, OPSB.
06/28/2012 Response letter to Mr. and Mrs. Brackett regarding the East Springfield-London-Tangy Project from T. Snitchler, Chairman, OPSB Board.
06/28/2012 Response letter sent to Jack Brickner filed on behalf of OPSB Staff.
06/28/2012 Response letter sent to Rebecca Brickner filed on behalf of OPSB Staff.
06/25/2012 Resolution No. 061112-01 states that the Board of Township Trustees of Concord Township, Delaware, Ohio supports the preferred route as proposed filed by J. Davis.
06/25/2012 Response letter sent to Delaware County Board of Commissioners field by OPSB Staff.
06/25/2012 Response letter sent to Liberty Township Board of Trustees filed by OPSB Staff.
06/19/2012 Response letter sent to Cecelia (Parker) Zaniewski filed on behalf of the OPSB , by Chairman T. Snitchler.
06/19/2012 Correspondence in support for the Preferred Route E. Springfield-London-Tangy (ESLT) 138 kV Transmission Line Project filed on behalf of consumer, Rebecca Brickner.
06/19/2012 Correspondence in support for the Preferred Route E. Springfield-London-Tangy (ESLT) 138 kV Transmission Line Project filed on behalf of consumer, Jack Brickner.
06/19/2012 Correspondence and resolution 12-0604-09 in support of the preferred route of the Springfield-London-Tangy Project filed by D. Anderson on behalf of Liberty Township.
06/11/2012 Letter and resolution 12-558 in support of the East-Springfield London-Tangy project filed by J. Walraven on behalf of the Delaware County Commissioners.
06/08/2012 Response to Mr. Klinker from M. Butler, OPSB.
06/07/2012 Public comment response to Mohamed Abdel-Rahman from the OPSB, K. Wissman.
06/07/2012 Response letter to Dr. and Mrs. Thomas J. Prestera from Chairman Todd Snitchler.
05/29/2012 Confidential treatment of document: Figures 02-1-26 filed by C. Darcy Copeland on behalf of American Transmission Systems, Inc. (25 pgs)
05/29/2012 Motion to seal portions of record of these proceedings filed by C. Darcy Copeland on behalf of American Transmission Systems, Incorporated..
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 21 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 20 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 19 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 18 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD -Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 17 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD continued: Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 16 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD continued: Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 15 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 14 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD -Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 13 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD continued: Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 12 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 11 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 10 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD -Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 9 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 8 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 7 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 6 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 5 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 4 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 3 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 2 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application CD - Stream and Wetland Delineation Reports for Preferred and Alternate Routes, including Common Section, Part 1 of 21 electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Notice Submittal of GIS Data to Staff electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
05/18/2012 Application continued. (Section 4)
05/18/2012 Application continued. (Section 3)
05/18/2012 Application continued. (Section 2)
05/18/2012 Application for a certificate of environmental compatibility and public need for the East Springfield-London-Tangy 138KV transmission line on behalf of American Transmission Systems, Incorporated by C. Jones. (Section1)
04/23/2012 Motion and memorandum in support for Certain Waivers electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
03/14/2012 The Concord Township Board of Trustees officially opposes any new right-of-ways or the acquisition of land for right-of-ways for the East Springfield-London-Tangy #11-4884-EL-BTX, and further encourages FirstEnergy Corporation and associated parties to use existing power transmission lines on and along existing right-of-ways. Filed on behalf of the Trustees board.
03/09/2012 Letter expressing concern over American Transmission Systems Inc proposed 138,000-v double circuit 3 phase line filed by Greg and Cathy Barcus.
03/06/2012 Correspondence stating that public comment of 1/19/12 was not docketed filed by J. Walraven.
03/06/2012 Letter expressing outraged by the complete lack of interest on the part of First Energy and American Transmission Systems of the destruction of land filed by Greg and Cathy Barcus.
02/17/2012 Public comment response letter to S. Ross from K. Wissman, OPSB Staff.
02/13/2012 Correspondence in regard to American Transmission Systems intended project filed on behalf of R. H. Spillman & A. C. Spillman.
02/13/2012 Response letter to Thomas L. Hollett, Jr. regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138 kV Electric Transmission Line project by K. Wissman.
02/08/2012 Response letter to Greg Barcus from Chairman Snitchler.
02/08/2012 Letter in response to Lisa Fulton from Chairman Snitchler.
02/02/2012 Letter from property owner Cecelia Parker Zaniewski voicing strong objection and opposition to the proposed route and also the method of informing the public about the public meetings for the East Springfield-London-Tangy Transmission Project.
01/31/2012 Letter of concern and opposition to the proposed route of the ATSI/FirstEnergy East Springfield-London-Tangy line project filed by consumers Raymond H. and Anne C. Spillman.
01/31/2012 Letter of concern and opposition to the proposed route of the ATSI/FirstEnergy East Springfield-London-Tangy line project filed by consumers Greg and Cathy Barcus. duplicate
01/26/2012 Letter of concern and opposition to the proposed route of the ATSI/FirstEnergy East Springfield-London-Tangy line project filed by consumer Marilyn Johnson Masters.
01/25/2012 Response letter to Michael D. Tarullo regarding his concern with the ATSI/FirstEnergy East Springfield-London-Tangy line project from K. Wissman, OPSB Staff.
01/25/2012 Letter of concern and opposition to the proposed route of the ATSI/FirstEnergy East Springfield-London-Tangy line project filed by consumers Greg and Cathy Barcus.
01/24/2012 Response letter to Lisa M. Fulton regarding the ATSI/FirstEnergy East Springfield-London-Tangy line project.
01/20/2012 Public Comment Response to concerned consumer, Mr.Lawrence W. Newman regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by K. Wissman, Staff.
01/17/2012 Correspondence letter sent to Dr. and Mrs Prestara filed by Scott J. Nally filed on behalf of the Ohio Power Siting Board.
01/12/2012 OPSB public response letter sent to: Thomas J. Prestera, D.O. filed by Todd A. Snitchler.
01/11/2012 Correspondence letter in regarding the meeting with FirstEnergy and Concord Township, filed by Bart Johnson.
01/10/2012 OPSB public response letter sent to: Ms. Turkall filed by Ohio Power Siting Staff.
01/06/2012 OPSB public response letter sent to: George L. Carpenter filed by Todd A. Snitchler.
01/06/2012 OPSB public response letter sent to: Trent and Jamie Ottery filed by Todd A. Snitchler.
01/06/2012 OPSB Response letter to Mark Camp regarding the Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138 kV Electric Transmission Line project. filed by K. Wissman on behalf of Ohio Power Siting Board.
12/27/2011 OPSB public response letter sent to: David and Donna Johnson filed by Todd A. Snitchler on behalf of OPSB.
12/21/2011 OPSB Response letter sent to: Bart Johnson filed by T. A. Snitchler, Chairman
12/20/2011 Response letter sent to: Jim Smock filed by K.Wissman on behalf of OPSB.
12/20/2011 Response letter sent to: Mark Wise filed by K.Wissman on behalf of OPSB.
12/20/2011 Response letter sent to: David and Pamela Anderson filed by K.Wissman on behalf of OPSB.
12/20/2011 Response letter sent to: David Anderson, Township Administrator filed by K. Wissman on behalf of OPSB.
12/20/2011 OPSB Response letter to A. Rourke regarding the ATSI East Springfield-London-Tangy transmission line project from K. Wissman, Staff.
12/09/2011 Public Comment Response to concerned consumer Mr. Boyers regarding American Transmission Systems, Incorporated (ATSI) / FirstEnergy's proposed East Springfield-London-Tangy 138 kV Electric Transmission Line project filed by K. Wissman on behalf of Ohio Power Siting Board.
12/08/2011 Public Comment Response to concerned consumer Ms. May regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Hartman regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. & Mrs. Moses regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. & Mrs. Grossman regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Ms. Lasher regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Maloney regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Keefer regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Kret regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Ms. Zaniewski regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Wooden regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. & Mrs. Pope regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Ms. Dodson regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Ms. McCoy regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Weisheimer regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public comment response letter from PUCO Staff to Mr. Phil Keller regarding OPSB process for approving utility projects.
12/08/2011 Public Comment Response to concerned consumer Mr. Heck regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. & Mrs. Spillman regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Pyrer regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. & Mrs. Fermier regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. & Mrs. Sawyer regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Ms. Irelan regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public comment response letter from PUCO Staff to Ms. Elaine Albrecht regarding OPSB process for approving utility projects.
12/08/2011 Public Comment Response to concerned consumer Ms. Manahan regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Ms. Yankus regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public comment response letter from PUCO Staff to Ms. Lisa Pietrantano regarding OPSB process for approving any utility projects.
12/08/2011 Public Comment Response to concerned consumer Mr. & Mrs. Elder regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Ms. Diehl regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Foor regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Gilliam regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Cook regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. & Mrs. Barcus regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public comment response letter from PUCO Staff to Ms. Deborah Smith regarding OPSB process for approving utility projects.
12/08/2011 Public Comment Response to concerned consumer Mr. Issel regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumer Mr. Ailshire regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public comment response letter from PUCO Staff to Mr. Robert Montag regarding OPSB process for approving utility projects.
12/08/2011 Public Comment Response to concerned consumer, Mr. Fultz filed by Staff.
12/08/2011 Public comment response letter from PUCO Staff to Mr. & Mrs. Demetrios Michelakis regarding OPSB process for approving utility projects.
12/08/2011 Public comment response letter from PUCO Staff to Ms. Marcia Perry regarding OPSB process for approving utility projects.
12/08/2011 Public Comment Response to concerned consumers Ron and Cynthia Kuhn regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/08/2011 Public Comment Response to concerned consumers Greg and Esther Dietz regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.
12/07/2011 Public Comment Response by the office of John R. Kasich in regards to: Thomas J. Prestera’s concern for FirstEnergy Corporations' proposed pipeline filed by Staff.
12/07/2011 Public Comment Response by the office of John R. Kasich in regards to: John and Kim Guzzo’s concern for the plans of First Energy Corporation, filed by PUCO Staff.
12/06/2011 Letter of concern regarding the proposed E. Springfield-London-Tangy transmission project filed by consumer L. Rhoade.
12/05/2011 Response letter from Staff to Mrs. Virginia Farneman regarding OPSB process for approving any utility projects.
12/05/2011 Response letter from Staff to Mr. Tom Hindes regarding OPSB East Springfield-London-Tangy 138 kV Electric Transmission Line project.
12/05/2011 Response letter from Staff to Mr. Dirk Gross regarding OPSB East Springfield-London-Tangy 138 kV Electric Transmission Line project.
12/02/2011 Response letter from Staff to William and Joyce Marshall regarding the OPSB Springfield-London-Tangy transmission line project
12/02/2011 Response letter from Staff to John and Kim Guzzo regarding the OPSB Springfield-London-Tangy transmission line project
11/18/2011 Proof of publication: Franklin, Delaware, Madison and Uniion Counties filed by R. J. Schmidt Jr. on behalf of FirstEnergy Service Co.
08/26/2011 In the matter of the pre-application notification East-Springfield London-Tangy 138 kV Transmission Line Project filed by J. Ruberto on behalf of FirstEnergy Service Company.