Date FiledSummaryPages
02/19/2013Public comment response letter mailed to Rep. A. Brenner from Chairman, T. Snitchler, OPSB Staff.2
02/11/2013Public comment in support of the Preferred Route for the ESLT Project filed by Rep. Andrew O. Brenner on behalf of Ohio House of Representatives. 1
01/25/2013Response letter sent to: Mrs. Diana J. Lockwood filed by K. Wissman on behalf of OPSB. 2
01/24/2013Response letter sent to Jim Bodenmiller filed by T. A. Snitchler, Chairman on behalf of OPSB.3
01/24/2013Public response sent to Mr. & Mrs. McLinn filed on behalf of the OPSB by M. Butler.4
01/24/2013Public response letter to Mr. Leslie M. & Susan W. Hall regarding the East Springfield-London-Tangy Transmission Project from OPSB Staff, K. Wissman.4
01/17/2013Correspondence in support of the 138kV electric power line on behalf of the City of Springfield filed by J.Bodenmiller.2
01/16/2013Public response letter to Deborah A. Bauder regarding her concern with the East Springfield-London-Tangy Transmission Project from OPSB Staff, K. Wissman.3
01/15/2013Response letter sent to: Anthony Sasson filed by T. A. Snitchler, Chairman on behalf of OPSB.10
01/10/2013Public comment response letter mailed to Phillip Frey regarding the East Springfield-London-Tangy Transmission Project from K. Wissman, OPSB.3
01/10/2013Public comment response to William Parry filed by T. Snitchler on behalf of OPSB.5
01/09/2013Public comment regarding the East Springfield-London-Tangy Transmission Line Project filed by J. Laub. 2
01/09/2013Public comment response sent to Jonas J. Gruenberg filed by K. Wissman on behalf of OPSB. 3
01/08/2013Public comment filed by Jonas J. Gruenberg of Coolidge Wall objecting the proposed routing of the transmission lines in the London Substation Project. 2
09/18/2012Public comment response to G. Carpenter regarding the East Springfield-London-Tangy Transmission Line Project from OPSB, T. Snitchler, Chairman.3
09/17/2012Correspondence supporting the preferred route filed by M. Coleman on behalf of the City of Columbus.1
09/06/2012OPSB public comments response letter sent to Kent and Rita Anders filed by PUCO Staff.3
08/30/2012OPSB Public Comments Response Letter sent to Mark A. Camp filed by OPSB Chairman.3
08/27/2012Response letter sent to Mr. Michael D. Tarullo filed by OPSB Staff.4
08/27/2012Response letter sent to Mr. Derek M. Garceau filed by OPSB Staff.3
08/27/2012Response letter sent to Ms. Margaret Ailshire filed by OPSB Staff.3
08/27/2012Response letter sent to Mr. George Leshy filed by OPSB Staff.3
08/21/2012Response letter sent to:Dr. Thomas J. Prestera filed by Klaus Lambeck, Chief on behalf of OPSB. 2
08/16/2012OPSB Response Letter to B. Moffitt regarding the East Springfield -London-Tangy Transmission Line Project.4
07/30/2012Response letter sent to: Bart Johnson filed by T.A. Snitchler, Chairman on behalf of OPSB. 3
07/30/2012Response letter sent to: Ed and Terry Klinker filed by T.A. Snitchler, Chairman on behalf of OPSB. 3
07/19/2012Response letter sent to: Gary Davis filed by T.A. Snitchler, Chairman on behalf of OPSB. 3
07/19/2012Public Comment (total-1) by Gary Davis in support of preferred route.1
07/18/2012Response letter sent to: Robert W. Tucker filed by Todd A. Snitchler,Chairman on behalf of OPSB.3
07/18/2012Letter expressing support for the approval by the Ohio Power Siting Board for the Preferred Route for the ESLT Project filed by Tracy and Todd Feucht. 1
07/17/2012Response letter sent to: Tracy & Todd Feucht filed by Todd A. Snitchler, Chairman on behalf of OPSB. 3
07/17/2012Letter expressing support for the approval by the Ohio Power Siting Board for the Preferred Route for the ESLT Project filed by Concerned Citizens. 2
07/17/2012Letter expressing support for the approval by the Ohio Power Siting Board for the Preferred Route for the ESLT Project filed by R.W. Tucker. 1
07/16/2012Response letter sent to: Amy Helder filed by T.A. Snitchler, Chairman on behalf of OPSB. 3
07/16/2012Response letter sent to: Ronald and Kathleen Moses filed by T.A. Snitchler, Chairman on behalf of OPSB. 3
07/16/2012Response letter sent to: Tom and Cyndie Lasher filed by T.A. Snitchler, Chairman on behalf of OPSB. 3
07/13/2012Public Comment in support of the Preferred Route for the ESLT Project filed by Tom & Cyndie Lasher.1
07/12/2012Public comment response sent to Michael A. Coughlin filed by OPSB Staff.3
07/12/2012Public comment response sent to Tad E. Goldmeyer filed by OPSB Staff.3
07/12/2012Public comment response sent to Lisa M. Fulton filed by OPSB Staff.3
07/12/2012Public comment response sent to Alan M. Fermier filed by OPSB Staff.3
07/11/2012Public comment in support to the Preferred Route for the ESLT Project filed by Ronald and Kathleen Moses.1
07/11/2012Public comment in support to the Preferred Route for the ESLT Project filed by A. Helder.1
07/11/2012Response letter sent to: Steve Hood filed by T.A. Snitchler, Chairman on behalf of OPSB. 4
07/10/2012Public comment response sent to David W. Anderson filed by OPSB Staff.5
07/10/2012Public comment response sent to John D. Boyers filed by OPSB Staff.3
07/10/2012Public comment response sent to Robert Seely filed by OPSB Staff.3
07/10/2012Letter expressing support for the approval by the Ohio Power Siting Board for the Preferred Route for the ESLT Project filed by W.R.Ash, Jr. 1
07/10/2012Public comment in support to the Preferred Route for the ESLT Project filed by A. Fernier.1
07/09/2012Response letter sent to William R. Ash, Jr. filed by OPSB Staff.3
07/06/2012Correspondence in support for the Preferred Route E. Springfield-London-Tangy (ESLT) 138 kV Transmission Line Project filed by Robert Seely. 1
07/06/2012Correspondence in support for the approval by the Ohio Power Siting Board of Preferred Route for the ESLT Project filed by D. Anderson.3
07/06/2012Correspondence in support for the approval by the Ohio Power SIting Board of Preferred Route for the ESLT Project filed by J. Boyers.1
06/28/2012Response letter to Concord Township Board of Trustees regarding the Springfield-London-Tangy Project from K. Wissman, OPSB.2
06/28/2012Response letter to Mr. and Mrs. Brackett regarding the East Springfield-London-Tangy Project from T. Snitchler, Chairman, OPSB Board.4
06/28/2012Response letter sent to Jack Brickner filed on behalf of OPSB Staff.4
06/28/2012Response letter sent to Rebecca Brickner filed on behalf of OPSB Staff.3
06/25/2012Resolution No. 061112-01 states that the Board of Township Trustees of Concord Township, Delaware, Ohio supports the preferred route as proposed filed by J. Davis.1
06/25/2012Response letter sent to Delaware County Board of Commissioners field by OPSB Staff.2
06/25/2012Response letter sent to Liberty Township Board of Trustees filed by OPSB Staff.2
06/19/2012Response letter sent to Cecelia (Parker) Zaniewski filed on behalf of the OPSB , by Chairman T. Snitchler.6
06/19/2012Correspondence in support for the Preferred Route E. Springfield-London-Tangy (ESLT) 138 kV Transmission Line Project filed on behalf of consumer, Rebecca Brickner.1
06/19/2012Correspondence in support for the Preferred Route E. Springfield-London-Tangy (ESLT) 138 kV Transmission Line Project filed on behalf of consumer, Jack Brickner. 2
06/19/2012Correspondence and resolution 12-0604-09 in support of the preferred route of the Springfield-London-Tangy Project filed by D. Anderson on behalf of Liberty Township.2
06/11/2012Letter and resolution 12-558 in support of the East-Springfield London-Tangy project filed by J. Walraven on behalf of the Delaware County Commissioners.2
06/08/2012Response to Mr. Klinker from M. Butler, OPSB.2
06/07/2012Public comment response to Mohamed Abdel-Rahman from the OPSB, K. Wissman.3
06/07/2012Response letter to Dr. and Mrs. Thomas J. Prestera from Chairman Todd Snitchler.5
03/14/2012The Concord Township Board of Trustees officially opposes any new right-of-ways or the acquisition of land for right-of-ways for the East Springfield-London-Tangy #11-4884-EL-BTX, and further encourages FirstEnergy Corporation and associated parties to use existing power transmission lines on and along existing right-of-ways. Filed on behalf of the Trustees board. 1
03/09/2012Letter expressing concern over American Transmission Systems Inc proposed 138,000-v double circuit 3 phase line filed by Greg and Cathy Barcus. 3
03/06/2012Correspondence stating that public comment of 1/19/12 was not docketed filed by J. Walraven.4
03/06/2012Letter expressing outraged by the complete lack of interest on the part of First Energy and American Transmission Systems of the destruction of land filed by Greg and Cathy Barcus. 3
02/17/2012Public comment response letter to S. Ross from K. Wissman, OPSB Staff.3
02/13/2012Correspondence in regard to American Transmission Systems intended project filed on behalf of R. H. Spillman & A. C. Spillman.2
02/13/2012Response letter to Thomas L. Hollett, Jr. regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138 kV Electric Transmission Line project by K. Wissman.3
02/08/2012Response letter to Greg Barcus from Chairman Snitchler.4
02/08/2012Letter in response to Lisa Fulton from Chairman Snitchler.4
02/02/2012Letter from property owner Cecelia Parker Zaniewski voicing strong objection and opposition to the proposed route and also the method of informing the public about the public meetings for the East Springfield-London-Tangy Transmission Project.6
01/31/2012Letter of concern and opposition to the proposed route of the ATSI/FirstEnergy East Springfield-London-Tangy line project filed by consumers Raymond H. and Anne C. Spillman.2
01/31/2012Letter of concern and opposition to the proposed route of the ATSI/FirstEnergy East Springfield-London-Tangy line project filed by consumers Greg and Cathy Barcus. duplicate1
01/26/2012Letter of concern and opposition to the proposed route of the ATSI/FirstEnergy East Springfield-London-Tangy line project filed by consumer Marilyn Johnson Masters.1
01/25/2012Response letter to Michael D. Tarullo regarding his concern with the ATSI/FirstEnergy East Springfield-London-Tangy line project from K. Wissman, OPSB Staff.1
01/25/2012Letter of concern and opposition to the proposed route of the ATSI/FirstEnergy East Springfield-London-Tangy line project filed by consumers Greg and Cathy Barcus.3
01/24/2012Response letter to Lisa M. Fulton regarding the ATSI/FirstEnergy East Springfield-London-Tangy line project.3
01/20/2012Public Comment Response to concerned consumer, Mr.Lawrence W. Newman regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by K. Wissman, Staff.3
01/17/2012Correspondence letter sent to Dr. and Mrs Prestara filed by Scott J. Nally filed on behalf of the Ohio Power Siting Board. 1
01/12/2012OPSB public response letter sent to: Thomas J. Prestera, D.O. filed by Todd A. Snitchler. 51
01/11/2012Correspondence letter in regarding the meeting with FirstEnergy and Concord Township, filed by Bart Johnson. 1
01/10/2012OPSB public response letter sent to: Ms. Turkall filed by Ohio Power Siting Staff. 3
01/06/2012OPSB public response letter sent to: George L. Carpenter filed by Todd A. Snitchler. 3
01/06/2012OPSB public response letter sent to: Trent and Jamie Ottery filed by Todd A. Snitchler. 3
01/06/2012OPSB Response letter to Mark Camp regarding the Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138 kV Electric Transmission Line project. filed by K. Wissman on behalf of Ohio Power Siting Board.3
12/27/2011OPSB public response letter sent to: David and Donna Johnson filed by Todd A. Snitchler on behalf of OPSB. 3
12/21/2011OPSB Response letter sent to: Bart Johnson filed by T. A. Snitchler, Chairman2
12/20/2011Response letter sent to: Jim Smock filed by K.Wissman on behalf of OPSB. 3
12/20/2011Response letter sent to: Mark Wise filed by K.Wissman on behalf of OPSB. 3
12/20/2011Response letter sent to: David and Pamela Anderson filed by K.Wissman on behalf of OPSB. 3
12/20/2011Response letter sent to: David Anderson, Township Administrator filed by K. Wissman on behalf of OPSB. 12
12/20/2011OPSB Response letter to A. Rourke regarding the ATSI East Springfield-London-Tangy transmission line project from K. Wissman, Staff.3
12/09/2011Public Comment Response to concerned consumer Mr. Boyers regarding American Transmission Systems, Incorporated (ATSI) / FirstEnergy's proposed East Springfield-London-Tangy 138 kV Electric Transmission Line project filed by K. Wissman on behalf of Ohio Power Siting Board.6
12/08/2011Public Comment Response to concerned consumer Ms. May regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. Hartman regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. & Mrs. Moses regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.4
12/08/2011Public Comment Response to concerned consumer Mr. & Mrs. Grossman regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Ms. Lasher regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. Maloney regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. Keefer regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. Kret regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Ms. Zaniewski regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.4
12/08/2011Public Comment Response to concerned consumer Mr. Wooden regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. & Mrs. Pope regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Ms. Dodson regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Ms. McCoy regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. Weisheimer regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public comment response letter from PUCO Staff to Mr. Phil Keller regarding OPSB process for approving utility projects.3
12/08/2011Public Comment Response to concerned consumer Mr. Heck regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.4
12/08/2011Public Comment Response to concerned consumer Mr. & Mrs. Spillman regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. Pyrer regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. & Mrs. Fermier regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.4
12/08/2011Public Comment Response to concerned consumer Mr. & Mrs. Sawyer regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.4
12/08/2011Public Comment Response to concerned consumer Ms. Irelan regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public comment response letter from PUCO Staff to Ms. Elaine Albrecht regarding OPSB process for approving utility projects.5
12/08/2011Public Comment Response to concerned consumer Ms. Manahan regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Ms. Yankus regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public comment response letter from PUCO Staff to Ms. Lisa Pietrantano regarding OPSB process for approving any utility projects.3
12/08/2011Public Comment Response to concerned consumer Mr. & Mrs. Elder regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.4
12/08/2011Public Comment Response to concerned consumer Ms. Diehl regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. Foor regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. Gilliam regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. Cook regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. & Mrs. Barcus regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.5
12/08/2011Public comment response letter from PUCO Staff to Ms. Deborah Smith regarding OPSB process for approving utility projects.3
12/08/2011Public Comment Response to concerned consumer Mr. Issel regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumer Mr. Ailshire regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public comment response letter from PUCO Staff to Mr. Robert Montag regarding OPSB process for approving utility projects.3
12/08/2011Public Comment Response to concerned consumer, Mr. Fultz filed by Staff.3
12/08/2011Public comment response letter from PUCO Staff to Mr. & Mrs. Demetrios Michelakis regarding OPSB process for approving utility projects.4
12/08/2011Public comment response letter from PUCO Staff to Ms. Marcia Perry regarding OPSB process for approving utility projects.3
12/08/2011Public Comment Response to concerned consumers Ron and Cynthia Kuhn regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/08/2011Public Comment Response to concerned consumers Greg and Esther Dietz regarding American Transmission Systems, Incorporated (ATSI) / First Energy's proposed East Springfield-London-Tangy 138kV Electric Transmission Line project filed by Staff.3
12/07/2011Public Comment Response by the office of John R. Kasich in regards to: Thomas J. Prestera’s concern for FirstEnergy Corporations' proposed pipeline filed by Staff.4
12/07/2011Public Comment Response by the office of John R. Kasich in regards to: John and Kim Guzzo’s concern for the plans of First Energy Corporation, filed by PUCO Staff.3
12/06/2011Letter of concern regarding the proposed E. Springfield-London-Tangy transmission project filed by consumer L. Rhoade.1
12/05/2011Response letter from Staff to Mrs. Virginia Farneman regarding OPSB process for approving any utility projects.5
12/05/2011Response letter from Staff to Mr. Tom Hindes regarding OPSB East Springfield-London-Tangy 138 kV Electric Transmission Line project.2
12/05/2011Response letter from Staff to Mr. Dirk Gross regarding OPSB East Springfield-London-Tangy 138 kV Electric Transmission Line project.3
12/02/2011Response letter from Staff to William and Joyce Marshall regarding the OPSB Springfield-London-Tangy transmission line project 4
12/02/2011Response letter from Staff to John and Kim Guzzo regarding the OPSB Springfield-London-Tangy transmission line project 3