Date Filed | Summary | Pages |
10/29/2015 | Case Action Form closing dockets electronically filed by Richard M. Bulgrin on behalf of Public Utilities Commission of Ohio | 2 |
06/01/2010 | Report on the Testing and Verification of Advanced Metering Infrastructure Installations electronically filed by Ms. Kathy J Kolich on behalf of Ohio Edison Company and The Cleveland Electric Illuminating Company and The Toledo Edison Company. | 6 |
06/01/2010 | Response of Duke Energy Ohio, Inc. to commission investigation into the testing and verification of advanced metering infrastructure installations filed by E. Watts. | 6 |
06/01/2010 | Report regarding procedures to ensure AMI meter accuracy filed by J. Sobeki on behalf of The Dayton Power and Light Company. | 6 |
05/28/2010 | Report regarding procedures to ensure AMI meter accuracy filed by J. Sobecki on behalf of The Dayton Power and Light Company. (FAX) | 7 |
05/28/2010 | Advanced metering infrastructure report filed by S. Nourse on behalf of Columbus Southern Power Company. | 7 |
03/25/2010 | Service Notice | 12 |
03/24/2010 | Entry ordering that each electric utility identified in Finding (1) file a report, as described in Finding (3), regarding any proposed or installed AMI equipment by May 31, 2010. | 3 |
03/24/2010 | In the matter of the commission's investigation into the testing and verification of advanced metering infrastructure. | 1 |