09/18/2006
|
Correspondence stating that the project was completed on June 27, 2006 and was put in operation June 27, 2006 filed on behalf of Columbia Gas of Ohio by G. Estep. |
08/08/2005
|
Storm water pollution prevention plan, tree clearing and stream crossing plan and the construction drawings for the project have been reviewed and accepted by staff filed by PUCO staff.
|
08/03/2005
|
Opinion and order and certificate, ordering that the stipulation filed July 7, 2005 and the supplemental joint stipulation filed on August 2, 2005, in this matter are approved and adopted; that a certificate be issued to Columbia Gas of Ohio, Inc. for the construction, operation and maintenance of the project as proposed along the preferred route as modified; that the certificate contain the applicable conditions set forth in section IV of this Opinion, Order, and certificate. |
08/02/2005
|
Easement agreement with addendum between Columbia Gas Company of Ohio and The Board of Trustees of Liberty Township, Ohio effective July 28, 2005 filed by M. Groomes, Columbia Gas and R.E. Cape, Board of Trustees of Liberty Township, Ohio. |
08/02/2005
|
Supplemental joint stipulation between staff and applicant Columbia Gas of Ohio, Inc. filed by staff of the Ohio Power Siting Board. |
07/29/2005
|
Staff investigation report and recommendation filed by PUCO staff. |
07/28/2005
|
Revised construction plans and drawings filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc. |
07/25/2005
|
Construction plans and drawings as referenced in Condition Nos. 19, 20, 26 and 30 of the Joint Stipulation and Recommended Findings of Fact and Conclusions of Law filed with Board on July 7, 2005, filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff. |
07/15/2005
|
With respect to recommend Condition 30 of the joint stipulation, this is to advise that applicant has elected to cross the portion of the preferred route in the vicinity of Stream Crossings 15 A, 15B, and 15C utilizing horizontal directional drilling (HDD). Easements are not available from those property owners along the existing electrical easement right-of-way, which would be necessary to relocate the center-line of the gas pipeline to the overhead electrical line right-of-way filed on behalf of Columbia Gas of Ohio by C. Schraff. |
07/15/2005
|
Easements for construction of the North Columbus Loop gas pipeline loop along the east side of Liberty Road filed on behalf of Columbia Gas of Ohio by C. Schraff. |
07/11/2005
|
Proof of Publication (Franklin Co., Delaware Co) |
07/07/2005
|
Joint stipulation and recommended findings of fact and conclusions of law filed on behalf of the Ohio Power Siting Board by S. Beeler, PUCO; M. Malone, Attorney General's office; C. Schraff and S. Sagun, Columbia Gas. |
07/06/2005
|
Additional statements for the record to supplement the oral testimony presented under oath on June 20, 2005, as agreed to by the hearing examiner and the Applicant, filed on behalf of Alum Creek by M. Samuels, FACT Board Member. |
07/06/2005
|
Transcript w/exhibits of hearing before Steven D. Lesser and Gregory A. Price, Hearing Examiners, at the PUCO, 180 E. Broad St., Columbus, Ohio, Room 11F, on June 21, 2005. (concluded) |
06/23/2005
|
Transcript of hearing held June 20, 2005, at Westerville Central High School, Westerville, OH, Examiner G. A. Price and S. D. Lesser. |
06/15/2005
|
Notice letter sent to individual landowners pursuant to OAC 4906-5-08(B)(3), and the notice letter to public officials required by OAC 4906-5-08(B)(3), filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff. |
06/03/2005
|
Staff Report of Investigation and Recommended Findings filed by K. Lamback. |
06/03/2005
|
Service Notice |
06/02/2005
|
Service Notice |
06/02/2005
|
Entry ordering that the motion to compel discovery filed by Mr. Bird on May 18, 2005 is denied. (SDL) |
06/01/2005
|
Letter stating that applicant will be filing data request in Case No. 04-1621-GA-BTX docket, the data requests filed on May 17, 2005, were inadvertently filed in the 04-1620-GA-BTX docket only, filed by PUCO staff, S. Beeler. |
05/31/2005
|
Notice of withdrawal as an intervener in case, filed on behalf of Genoa Township by M. Atkeson and J. Albers. |
05/19/2005
|
Proof of Publications filed on behalf of Columbia Gas of Ohio by C. Schraff. |
04/14/2005
|
Service Notice |
04/14/2005
|
Entry ordered that the hearings be scheduled at the times and places designated in finding 7; that Genoa Township's motion to intervene is granted; that notice of the hearings be published by Columbia in accordance with finding 8; that the Board will accept petitions to intervene in the adjudicatory hearing by interested persons up to five days prior to the scheduled date for the non-adjudicatory hearing, or late if good cause is shown, in accordance with finding 9. (SDL) |
03/24/2005
|
Memorandum of William Bird in opposition to motion by applicant Columbia Gas of Ohio, Inc. to consolidate Proceedings. |
03/23/2005
|
Correspondence stating that staff will support Columbia Gas request for consolidation of these cases filed by PUCO staff. |
03/22/2005
|
Notice of Intervention of Genoa Township filed by M. Atkenson and J. Albers. |
03/18/2005
|
Motion to consolidate proceedings and request for expedited ruling and memorandum in support filed on behalf of Columbia Gas of Ohio by C. Schraff. |
02/23/2005
|
Affidavit of proof of service on public officers filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc. |
02/07/2005
|
Service Notice |
02/07/2005
|
Letter informing applicant that the application filed with the Ohio Power Siting Borad on 12/2/2004, has been found to comply with Chapters 4906-02, et. seq. of the O.A.C., filed on behalf of Ohio Power Siting Board. |
02/04/2005
|
Entry ordered that Columbia's motion for waivers of Section 4906.06(A), Revised Code; and Rule 4906-5-04, O.A.C. is granted. (SL) |
01/26/2005
|
Memorandum reviewing staff discussion on waivers requested by applicant. |
01/25/2005
|
Additional project materials for the Northern Columbus Loop Projects filed by S. Sagan on behalf of Columbia Gas of Ohio, Inc. |
01/13/2005
|
Supplemental memorandum in support of motion filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc. |
12/03/2004
|
Letter stating that Staff does not object to the waiver requests as made by the applicant, filed by K. Lambeck, PUCO staff. |
12/02/2004
|
Application of Columbia Gas of Ohio, Inc. for a certificate of environmental compatibility and public need for the construction of the Northern Columbus Loop Natural Gas Pipeline Project (Phase VI) filed by C. Schraff. (Part 1 of 4) |
12/02/2004
|
Application Continued. (Part 2 of 4) |
12/02/2004
|
Application Continued. (Part 3 of 4) |
12/02/2004
|
Application Continued. (Part 4 of 4) |
11/08/2004
|
Correction to memorandum in support of motion by applicant Columbia Gas of Ohio, Inc. for certain waivers filed by C. Schraff. |
11/02/2004
|
Response letter to William R. Bird filed by K. Lambeck, PUCO staff. |
10/29/2004
|
Correspondence letter relating to the proposed Norther Loop Project filed by William Bird. |
10/21/2004
|
Motion for certain waivers filed on behalf of Columbia Gas of Ohio by C. Schraff. |
10/20/2004
|
In the matter of the application for certificate and notification of Columbia Gas of Ohio plans to construct a natural gas pipeline to provide service in the northern portion of Franklin County and southern portion of Delaware County. |