DIS - Case Record for 95-0527-EL-BTX Skip to main content

Case Record For:

95-0527-EL-BTX

File a Public Comment
Case Title: TOLEDO EDISON/NORTH STAR STEEL
Status: AR-Archived
Industry Code: EL-ELECTRIC
Purpose Code: BTX-Application for a Certificate/ Gas or Electric
Date Opened: 5/31/1995
Date Closed: 10/2/1995
Printable Docket Card Service List
View All
1 - 15 of 37 documents 1 /  3 
Date FiledSummaryPages
10/16/2000ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.13
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates 7
10/16/2000ICN #0035 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)6
08/13/1996Letter stating the construction line is complete filed on behalf of applicant by M. Kempic. (1 pg.)1
02/05/1996ICN #0033 Letter to K. Wissman, PUCO staff, regarding the final study performed in this case, filed on behalf of applicant by M. Kempic. (1 pg.)1
01/04/1996ICN #0032 Final Construction drawing concerning the above-stated siting project filed on behalf of applicant by M. Kempic. (1 pg.)1
12/20/1995ICN #0031 Letter to K, Wissman, PUCO staff, concerning the final study performed in this case, filed on behalf of applicant by M. Kempic. (1 pg.)1
11/01/1995ICN #0030 Cultural Resource Survey filed on behalf of applicant by M. Kempic. (5 pgs.)5
10/25/1995ICN #0029 Construction Storm Water Pollution Prevention Plan and a letter and the permit from the Ohio EPA in regards to coverage under Ohio EPA storm water construction general permit No. OHR103892, filed on behalf of applicant by M. Kempic. (36 pgs.)36
10/24/1995ICN #0028 Letter to Mr. Mark Kempic, Centerior Energy, stating that they may proceed with construction of the project depicted by the drawings submitted on October 19, 1995, filed by K. Wissman, PUCO staff. (1 pg.)1
10/02/1995Opinion, Order, and Certificate ordering that the stipulation of findings, conclusions, and recommendations is approved and that a certificate of environmental compatibi- lity and public need is hereby issued to Toledo Edison Com- pany for the construction, operation, and maintenance of the North Star Steel 345 kV transmission line using the preferred route in accordance with the conditions set forth in section V of this opinion.20
09/15/1995ICN #0026 Transcript filed for hearing held 9/6/95, (DB), 14 pgs., Submitted.14
09/06/1995ICN #0025 Joint stipulation of findings and recommendations filed on behalf of applicant by M. Kempic; North Star Steel by K. Betts; and the OPSB staff by M. Malone and G. Rocco. (15 pgs.)15
09/06/1995ICN #0024 Investigation report, site visit conducted 29 August, 1995, filed on behalf of the OPSB staff by R. Yerian. (3 pgs.)3
08/31/1995Transcript for hearing held 8/24/95, Delta, Ohio, (CG), (RB) (JB), 49 pgs. sub.49
 
1 /  3 
      
      
Attorney General:
Rocco,Gerald
Attorney Examiner:
Bulgrin, Richard