Case Record For:

92-1232-EL-BTX

File a Public Comment
Case Title: DAYTON POWER & LIGHT/BLUEJACKET
Status: AR-Archived
Industry Code: EL-ELECTRIC
Purpose Code: BTX-Application for a Certificate/ Gas or Electric
Date Opened: 7/10/1992
Date Closed: 9/20/1993
Printable Docket Card Service List
View All
1 - 15 of 46 documents 1 /  4 
Date FiledSummaryPages
10/16/2000ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.13
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates 7
10/16/2000ICN #0044 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)6
08/21/1996ICN #0043 Correction to Notice of Termination filed on be- half of applicant by T. Burgess. (PREVIOUSLY FILED ON 7/2/96 INCORRECTLY IN CASE NO. 92-1945-EL-BTX.) (3 pgs.)3
08/19/1996ICN #0042 Correction to the June 24, 1996 filing, submitted on behalf of applicant by T. Burgess. (1 pg.)1
05/14/1996ICN #0041 Letter advising the Commission that the subject project has been completed and was energized on May 8, 1996, filed on behalf of applicant by H. Shamash. (1 pg.)1
09/18/1995ICN #0040 Correspondence letter to Mr. Hertzel Shamash, DP&L, filed by K. Wissman, OPSB staff. (1 pg.)1
09/15/1995ICN #0039 Revised engineering drawings filed on behalf of applicant by H. Shamash. (2 pgs.)2
09/06/1995ICN #0038 Copy of previously provided permits with the new expiration dates, filed on behalf of applicant by T. Bur- gess. (4 pgs.)4
08/16/1995ICN #0037 Correspondence letter to Mr. Hertzel Shamash, DP&L, stating that they may proceed with construction of the project depicted by the drawings, filed by K. Wissman, OPSB staff. (1 pg.)1
08/16/1995ICN #0036 Engineering drawings for work to be completed at Blue Jacket Substation, filed on behalf of applicant by H. Shamash. (1 pg.)1
05/31/1995ICN #0035 Final certificate of plan approval for con- struction of the Kirby Substation Control Building from the Ohio Department of Industrial Relations, filed on behalf of applicant by T. Burgess. (3 pgs.)0
05/23/1995ICN #0034 ODOT permits for crossing State Route 292 and U.S. Route 68 filed on behalf of applicant by H. Shamash. (12 pgs.)0
05/01/1995ICN #0033 State of Ohio Department of Transportation permits to cross state routes 31 and 739 in Union County, Ohio filed on behalf of DP&L by H. Shamash. (5 pgs.)0
04/18/1995ICN #0032 Letter to Mr. Hertzel Shamash, DP&L, stating that the company may proceed with construction of the portion of the project depicted by the engineering drawings, filed by K. Wissman, OPSB staff. (1 pg.)0
 
1 /  4 
      
      
Attorney General:
Attorney Examiner: