1 - 15 of 48 documents 1 /  4 
Date FiledSummaryPages
08/23/1996ICN #0051 Information regarding revegetation of the area previously disturbed by construction filed on behalf of applicant by R. McElfresh. (1 pg.)1
06/10/1996ICN #0050 Letter to Mr. R. McElfresh stating that the engi- neering drawings for the Foster-Lebanon project submitted on June 3, 1996, have been reviewed by the staff, and that they may proceed with construction of the project as depicted by the drawings, filed by K. Wissman, PUCO staff. (1 pg.)1
06/06/1996ICN #0049 Engineering drawings 14W-T11 and 25W-T4 filed on behalf of applicant by R. McElfresh. (3 pgs.)3
01/05/1996Service Notice2
01/05/1996Entry ordering that the applicant's request for expedited process provided under Rule 4906-5-09 (B)(2)(b), O.A.C., is denied. Further ordered that the amendment application be redesignated as Case No. 96-12-EL-BTA, and all future filings be filed under this number.2
09/14/1995ICN #0043 Letter describing the additional erosion control measures to be completed between Fujitec Drive and I-71, filed on behalf of applicant by T. Chaney. (3 pgs.)3
09/14/1995ICN #0042 Letter to Mr. W. Thomas Chaney in response to his transmittal dated August 16, 1995, filed by K. Wissman, OPSB staff. (2 pgs.)2
08/03/1995ICN #0041 Letter to Ms. Darlene S. Radcliffe stating that a portion of the facility represented on the drawings is not consistent with the description of the facility certified in this case, filed by K. Wissman, OPSB staff. (1 pg.)1
08/02/1995ICN #0040 Next three engineering drawings 14W-T11, 25W-T4 25W-TS, filed on behalf of applicant by D. Radcliffe. (1 pg.)1
07/11/1995ICN 0019 Additional information filed on behalf of applicant by W. Chaney. (2 pgs.)2
06/16/1995ICN #0018 Letter in response to the May 2, 1995 letter which references that the erosion control concerns for this project have been satisfactorily addressed, filed by K. Wissman, OPSB staff. (4 pgs.)0
05/19/1995ICN #0017 Information in response to the OPSB letter of April 11, 1995, filed on behalf of applicant by T. Chaney. (96 ps.)0
04/18/1995ICN #0016 Letter to Ms. Darlene S. Radcliffe, CG&E, stating that the company may proceed with the construction of the portion of the project depicted by the engineering draw- ings, filed by K. Wissman, OPSB staff. (1 pg.)0
04/14/1995ICN# 0015 Engineering drawings 27W-T11, 27W-T12 and 27W-T13. filed on behalf of CG&E by D. Radcliffe. (4 pgs)0
04/12/1995ICN #0014 Letter to Mr. W. T. Chaney, CG&E, filed by K. Wissman, PUCO staff. (2 pgs.)0
 