Date Filed | Summary | Pages |
02/23/1994 | ICN #0027 Letter stating that the Gavin 138kV Project was placed in service on February 17, 1994, filed on behalf of applicant by J. Schrader. | 0 |
02/24/1993 | ICN #0026 Letter to Mr. J. E. Schrader, Civil Engineering Manager, Ohio Power Company, authorizing him to proceed with construction of the facility, fild by K. Wissman, PUCO staff. (FILED 2/22/93) | 0 |
02/22/1993 | ICN #0025 Gavin 138 kV Project - Erosion and Sedimentation Control Plan, filed on behalf of applicant by J. Schrader. | 0 |
12/07/1992 | ICN #0024 Opinion & Order adopting the stipulation in its entirety; that the certificate of environmental compati- bility and public need for the Gavin 138 kV project is issued to allow the construction, operation, and mainten- ance of such facility. (OPSB) | 0 |
12/01/1992 | ICN #0023 Addendum filed on behalf of Ohio Power by C. Schraff and the OPSB staff by R. Fowler. | 0 |
10/09/1992 | ICN #0022 Transcript filed for hearing held 9/24/92, (MF), 5 pgs., Submitted. | 0 |
10/07/1992 | ICN #0021 Joint stipulation of findings, conclusions, and recommendations, filed on behalf of applicant by C. Schraft and the OPSB staff by M. Malone. | 0 |
09/30/1992 | ICN #0020 Transcript filed for hearing held 9/10/92, (MF), 7 pgs., Con't. | 0 |
09/29/1992 | ICN #0019 Transcript filed for hearing held 9/9/92, (MF), 6 pgs., Con't. (Gallipolis, Ohio) | 0 |
09/18/1992 | ICN #0018 Entry scheduling adjudicatory hearing at 10:00 a.m. on 9/24/92 and 9/25/92 at the Commission offices. (OPSB) | 0 |
09/09/1992 | ICN #0017 Motion for continuance and memorandum in support filed on behalf of the OPSB staff by M. Malone. | 0 |
09/01/1992 | ICN #0016 Entry granting IEC's motion to intervene. (OPSB) | 0 |
08/25/1992 | ICN #0015 Staff Report filed. | 0 |
08/03/1992 | ICN #0014 Proofs of publication filed on behalf of applicant by J. Schrader. | 0 |
07/13/1992 | ICN #0013 Entry amending the July 9, 1992 entry to reflect the correct location of the September 9, 1992 local public hearing. (OPSB) | 0 |