Case Record For: 20-1363-EL-BLN File a Public Comment Case Title: Eber-Swanton 138 kV Second Tap to Johnson Controls Substation Project Status: OPEN-OPEN Industry Code: EL-ELECTRIC Purpose Code: BLN-letter of notification Date Opened: 8/12/2020 Date Closed: Case Documents Public Comments Parties of Record Related Cases Printable Docket Card Service List View All 1 - 6 of 6 documents 1 / 1 Date FiledSummaryPages 12/23/2020Notice of the Commencement of Construction of Project electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.2 09/10/2020Service Notice.2 09/10/2020Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB.4 08/27/2020Proof of Pub of Notice of the Filing of the Letter of Notification Application with the Board electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.3 08/20/2020Letter of Notification Application electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.36 08/12/2020In the matter of the filing of the Pre-Application Notification Letter for Project electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.2 1 / 1 Attorney General: Attorney Examiner: