DIS - Case Record for 17-1241-EL-BNR Skip to main content

Case Record For:

17-1241-EL-BNR

File a Public Comment
Case Title: Jackman-GM Powertrain 138kV Transmission Line Project
Status: CL-CLOSED
Industry Code: EL-ELECTRIC
Purpose Code: BNR-Construction notification report
Date Opened: 5/12/2017
Date Closed: 9/3/2019
Printable Docket Card Service List
View All
1 - 8 of 8 documents 1 /  1 
Date FiledSummaryPages
09/03/2019Case Action Form to Close Case with an effective date of 9/3/19, electronically filed by Ms. Mary E Fischer on behalf of Jeffrey R. Jones, Attorney Examiner, Public Utilities Commission of Ohio.2
01/11/2018Notice advising that Construction on 138 kV Structure Addition to GM Powertrain Transmission Lines Substation Project was completed on January 7, 2018 filed by N. Bryksenkova on behalf of FirstEnergy Service Company.1
06/12/2017Construction Notice advising of June 16, 2017 start date filed on behalf of FirstEnergy Service Company by N. Bryksenkova.1
06/02/2017Service Notice2
06/02/2017Staff Report of Investigation electronically filed by Adam Bargar on behalf of Staff of OPSB.4
05/19/2017Construction Notice and Application for a Certificate of Environmental Compatibility and Public Need for the 138kV Structure Addition to GM Powertrain Transmission Line Substation Project (Part 2 of 2) electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.9
05/19/2017Construction Notice and Application for a Certificate of Environmental Compatibility and Public Need for the 138kV Structure Addition to GM Powertrain Transmission Line Substation Project (Part 1 of 2) electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.33
05/12/2017Pre-Application Notice Letter for Jackman-GM Powertrain Transmission Line Project electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.2
 