DIS - Case Record for 10-0325-EL-COI Skip to main content

Case Record For:

10-0325-EL-COI

File a Public Comment
Case Title: IN THE MATTER OF THE COMMISSION'S INVESTIGATION INTO THE TESTING AND VERIFICATION OF ADVANCED METERING INFRASTRUCTURE INSTALLATIONS
Status: CL-CLOSED
Industry Code: EL-ELECTRIC
Purpose Code: COI-Commission inquiry
Date Opened: 3/24/2010 11:49:20 AM
Date Closed: 10/29/2015
Printable Docket Card Service List
View All
1 - 9 of 9 documents 1 /  1 
Date FiledSummaryPages
10/29/2015Case Action Form closing dockets electronically filed by Richard M. Bulgrin on behalf of Public Utilities Commission of Ohio2
06/01/2010Report on the Testing and Verification of Advanced Metering Infrastructure Installations electronically filed by Ms. Kathy J Kolich on behalf of Ohio Edison Company and The Cleveland Electric Illuminating Company and The Toledo Edison Company.6
06/01/2010Response of Duke Energy Ohio, Inc. to commission investigation into the testing and verification of advanced metering infrastructure installations filed by E. Watts. 6
06/01/2010Report regarding procedures to ensure AMI meter accuracy filed by J. Sobeki on behalf of The Dayton Power and Light Company. 6
05/28/2010Report regarding procedures to ensure AMI meter accuracy filed by J. Sobecki on behalf of The Dayton Power and Light Company. (FAX)7
05/28/2010Advanced metering infrastructure report filed by S. Nourse on behalf of Columbus Southern Power Company.7
03/25/2010Service Notice12
03/24/2010Entry ordering that each electric utility identified in Finding (1) file a report, as described in Finding (3), regarding any proposed or installed AMI equipment by May 31, 2010.3
03/24/2010In the matter of the commission's investigation into the testing and verification of advanced metering infrastructure.1
 
1 /  1 
      
      
Attorney General:
Attorney Examiner:
Bulgrin, Richard